• Home
  • Summary of Options
  • Full Engineering Report
  • Products From Public Process
Download the full engineering report (45mb).
Download Addendum #1 October 8, 2012 (5mb) separate document

If you are unable to download the full report due to bandwidth limitations, 
it is available below in several smaller sections:
  • Cover and Content
  • Introduction
  • Existing Trail Conditions
  • Trail Connection Options
  • Trail Option Analysis
  • Appendix A: Environmental Letter Report
  • Appendix B:  Geotechnical Engineering Study
  • Appendix C: Study Typical Sections
  • Appendix D: Trail Segment Cost Estimates
  • Appendix E:  Trail Option Evaluation Matrix


FOR MORE INFORMATION CONTACT: LINDSEY UTTER - LINDSEY.UTTER@CO.PITKIN.CO.US

Create a free website with Weebly